Major Power Plants . Completed Projects . Projects . GAMA Power . GAMA

Major Power Plants

  • 200 MW HARTHA THERMAL POWER STATION REHABILITATION - UNIT 4 200 MW HARTHA THERMAL POWER STATION REHABILITATION - UNIT 4 Hartha/ IRAQ Ministry of Electricity Republic of Iraq, General Directorate of Electricity & Energy Production Basrah

    Construction Period

    20 Months (April 2016 - December 2017)

    Project Description

    Hartha Unit-4 Rehabilitation project consists of rehabilitation of instruments and control system of Turbine and Boiler, Rehabilitation of generator and electrical equipments, rehabilitation of boiler runs on 4 types of fuel, rehabilitation of turbine and  increase the output of generator to its original value 200 MW and extend the lifetime of the Boiler, turbine and generator to 10 years.

    Main Contractor

    GAMA Power Systems and Mitsubishi Hitachi Power Systems (MHPS)

    Scope of Work

    GAMA Power Systems performed following scope of works: 

    CONSTRUCTION
     
    All mechanical erection works and rehabilitation works comprising of:
    • Steam Turbine with its all accessory skids
    • Boiler
    • Mechanical BOP including feed water pump, condensate pumps, GRF, FDF, air and gas ducts, burner system etc.
    • 24,169 WDI field welding, valves and supports
    • Mechanical Installation (3,000 ton)
    • Insulation 16,000 m2
    Installation and rehabilitation of all electrical, instrumentation and control systems comprising of:
    • DCS
    • MV and LV Systems
    • MCCs
    • Generator
    • 170 km of cable pulling
    • 19,500 terminations

  • 1,200 MW HAMITABAT COMBINED CYCLE POWER PLANT 1,200 MW HAMITABAT COMBINED CYCLE POWER PLANT Kırklareli / TURKEY HAMITABAT Elektrik Üretim ve Ticaret A.Ş.

    Construction Period

    28 Months Unit 1 (April 2015 - August 2017), 32 Months Unit 2 (April 2015 - November 2017)

    Project Description

    EPC Contract for Hamitabat 1200 MW Natural Gas Combined Cycle Power Plant on a turnkey basis.
    1200 MW Natural Gas Combined Cycle Power Plant which is comprised two units. Each unit is based on a single-shaft configuration, comprising of one gas turbine, one steam turbine, one generator (SGT5-8000H Gas Turbine, SST5-5000 Steam Turbine, SGen5-3000W Generator) and one Heat Recovery Steam Generator. The units is utilizing the existing dry cooling towers as a part of cooling system. Electricity is transferred to the grid via the existing substation which was refurbished.
     
    Within the project scope; GAMA Power Systems provided all major equipment as well as other auxiliary equipment, and managed all the conceptual and detail engineering of the plant, civil and electro mechanical works, instrument and control systems, test and commissioning works and training of the Employer’s staff.

    Main Contractor

    GAMA Power Systems Inc.

  • 390 MW KAZANSKAYA COMBINED HEAT AND POWER PLANT 390 MW KAZANSKAYA COMBINED HEAT AND POWER PLANT Kazan / RUSSIAN FEDERATION TGK 16 (TAIF)

    Construction Period

    39 Months (May 2014 - July 2017)

    Project Description

    EPC Contract for Modernization of 390 MW Kazan CHPP-3 on a turnkey basis.
    Modernization of Kazan CHPP-3 envisages delivery and installation of 1 piece of GE 9HA 01 gas turbine, 1 piece of GE H28.56 generator, 1 piece of CMI double-pressure HRSG. The scope of modernization project also includes all necessary ancillary plant equipment and modification of the existing switchyard.   

    Main Contractor

    GE and Gama Power Systems (Closed Consortium Agreement)

  • 840 MW IC ANADOLU COMBINED CYCLE POWER PLANT 840 MW IC ANADOLU COMBINED CYCLE POWER PLANT Kirikkale / Turkey İç Anadolu Doğalgaz Elektrik Üretim ve Ticaret A.Ş.

    Construction Period

    36 Months (December 2013 - December 2016)

    Project Description

    Construction of a Combined Cycle Power Plant (CCPP) in Kırıkkale with a total power output of 840 MW is to be realized for İç Anadolu Doğalgaz Elektrik Üretim ve Ticaret A.Ş. GE STAG 209 9FB MS, is to be used in the power plant which is designed for 30 years lifespan. GAMA Power Systems and GE Energy as consortium undertakes the responsibility of supply and erection of 2 GE 9FB gas turbines, 1 GE steam turbines, 2 Doosan HRSG’s, Air Cooled Condenser, 380 kV HV switchyard as well as all balance of plant equipment under an EPC contract. Within this scope, basic & detail design of the power plant, civil works, structural, electro mechanical works, erection, installation of electrical, instrumentation & control systems, test and commissioning, start-up works and training of the Employer’s personnel is to be performed in the course of project.

    The project, İç Anadolu Combined Cycle Power Plant will generate about 6,300 GWh Energy which corresponds 2.5% of total national Energy consumption and almost 50% of Ankara’s energy consumption.

    Main Contractor

    GAMA Power Systems and GE Energy Products France SNC Consortium

  • 870 MW ERZIN COMBINED CYCLE POWER PLANT 870 MW ERZIN COMBINED CYCLE POWER PLANT Hatay / TURKEY EGEMER Elektrik Üretim A.Ş.

    Construction Period

    34 Months (October 2011 - August 2014)

    Project Description

    Combined cycle power block in one multi-shaft arrangement. Power plant is comprised of two GE 209FB gas turbine, Skoda MTD60 steam türbine, three GE 330H generator, with associated Doosan Heat Recovery Steam Generators.
    EPC project including all basic & detail design of the power plant, procurement of all power plant equipment, all civil, structural, electromechanical works erection, installation of all electrical, instrumentation & control systems as well as testing, commissioning and start-up works and Employer’s personnel training. 

    Main Contractor

    GE-GAMA Power Systems Consortium

  • RIGA 420 MW ELECTRICAL and 270 MW THERMAL OUTPUT POWER PLANT RIGA 420 MW ELECTRICAL and 270 MW THERMAL OUTPUT POWER PLANT Riga / LATVIA AS Latvenergo

    Construction Period

    41 Months (April 2010 - September 2013)

    Project Description

    Combined cycle power block in one multi-shaft arrangement. Power plant is comprised of one GE 9FB.03 gas turbine, one GE 330H generator, Siemens ST ENK, HNG, WK steam turbines and generators with associated heat recovery steam generators.

    EPC project including all basic & detail design of the power plant, procurement of all power plant equipment, all civil, structural, electromechanical works erection, installation of all electrical, instrumentation & control systems as well as testing, commissioning and start-up works and Employer’s personnel training.

    Main Contractor

    GAMA Power Systems Inc.

  • SURGUT 800 MW COMBINED CYCLE POWER PLANT SURGUT 800 MW COMBINED CYCLE POWER PLANT Surgut / RUSSIAN FEDERATION OGK-4

    Construction Period

    44 Months (November 2007 - June 2011)

    Project Description

    GE International Inc.(GEII) - GAMA Power Systems Consortium’s scope of supply for this project is to construct two 109FA 50Hz Single-Shaft configured Power Plant, comprised of one GE 9FA gas turbine, one GE D10 steam turbine, one GE 390H generator, a horizontal three-pressure level CMI Heat Recovery Steam Generator, plus balance of plant equipment necessary for the plant's operation. EPC contract includes all basic & detailed design of the power plant, procurement of all power plant equipment, all civil, structural works, all mechanical erection works, installation of all electrical, instrumentation and control systems. The contract also includes commissioning, start-up works and training of client's personnel.

    Main Contractor

    GEII - GAMA Power Systems Consortium

    Notes

    This project has been executed by the Consortium of GE International Inc. - GAMA Power Systems Inc.

  • 450 MW WHITEGATE COMBINED CYCLE POWER PLANT 450 MW WHITEGATE COMBINED CYCLE POWER PLANT Whitegate, Co. Cork / IRELAND Bord Gais Eireann (BGE)

    Construction Period

    38 Months (September 2007 - November 2010)

    Project Description

    GE Corporation - GE International Inc. - GAMA Power Systems Consortium’s scope of supply for this project is to construct one 109FB 50Hz Single-Shaft configured power plant, comprised of one GE 9FB gas turbine, one GE A15 steam turbine, one GE 450H generator, heat recovery steam generator, plus balance of plant equipment necessary for the plant’s operation. EPC contract includes all basic & detailed design of the power plant, procurement of all power plant equipment, all civil, structural works, all mechanical erection works, installation of all electrical, instrumentation and control systems. The contract also includes commissioning, start-up works and training of client's personnel.

    Main Contractor

    GEC - GEII - GAMA Power Systems Consortium

  • 220 MW SKOPJE COMBINED CYCLE COGENERATION POWER PLANT 220 MW SKOPJE COMBINED CYCLE COGENERATION POWER PLANT Skopje East Industrial Zone, MACEDONIA TE-TO AD

    Construction Period

    48 Months (May 2007 - April 2011)

    Project Description

    GAMA Power Systems – Alstom Consortium’s scope for this project is to construct a combined cycle cogeneration power plant which is comprised of one Alstom 13E2 gas turbine unit (GT), one; two pressure heat recovery steam generator (HRSG) and one Alstom 8CK76 steam turbine (ST) on EPC basis. The power block is a combined cycle power block in multi-shaft arrangement and with a net power output of 227 MWe and a heat extraction of 160 MWt for the supply of district heating water, plus balance of plant equipment necessary for the plant’s operation. EPC contract includes all basic & detailed design of the power plant, procurement of all power plant equipment, all civil, structural works, all mechanical erection works, installation of all electrical, instrumentation and control systems. The contract also includes commissioning, start-up works and training of client's personnel.

    Main Contractor

    GAMA Power Systems (Consortium Leader) – Alstom (Switzerland) Ltd.

  • 400 MW SHATURA COMBINED CYCLE POWER PLANT 400 MW SHATURA COMBINED CYCLE POWER PLANT Shatura / RUSSIAN FEDERATION OGK-4

    Construction Period

    40 Months (July 2007 - December 2010)

    Project Description

    Turn-key implementation of 400 MW combined cycle power plant on EPC basis. GE International Inc.(GEII) - GAMA Power Systems Consortium’s scope of supply for this project is to construct one 109FA 50Hz Single-Shaft configured power plant, comprised of one GE 9FA gas turbine, one GE D10 steam turbine, one GE 390H generator, a horizontal three-pressure level CMI heat recovery steam generator, plus balance of plant equipment necessary for the plant’s operation. EPC contract includes all basic & detailed design of the power plant, procurement of all power plant equipment, all civil, structural works, all mechanical erection works, installation of all electrical, instrumentation and control systems. The contract also includes commissioning, start-up works and training of client's personnel.

    Main Contractor

    GE - GAMA Power Systems Consortium

  • 300 MW SAMRA COMBINED CYCLE POWER PLANT 300 MW SAMRA COMBINED CYCLE POWER PLANT Al Samra / JORDAN Central Electricity Generating Company

    Construction Period

    24 Months (September 2004 - September 2006)

    Project Description

    Project is a natural gas/fuel oil fired combine cycle plant providing a nominal 300 MW electrical output. The power island consists of two GE combustion turbine generators, which feed exhaust gases to two Nooter Eriksen HRSGs, which in turn feed steam to a single Fuji steam turbine generator set. The plant fires natural gas fuel and fuel oil. Power is generated at 15 kV in the CTGs and 15 kV in the STG, and then stepped up through individual transformers to the Jordan grid voltage at 400 kV. Plant auxiliary power is back-fed from the grid or GSUs through an auxiliary transformer on each CTG bus. EPC contract includes all basic & detailed design of the power plant, procurement of all power plant equipment, all civil, structural works, all mechanical erection works, installation of all electrical, instrumentation and control systems. The contract also includes commissioning, start-up works and training of client's personnel.

    Main Contractor

    Black&Veatch - GAMA Consortium

  • 400 MW TYNAGH COMBINED CYCLE GAS TURBINE (CCGT) POWER PLANT 400 MW TYNAGH COMBINED CYCLE GAS TURBINE (CCGT) POWER PLANT Galway / IRELAND Tynagh Energy Ltd (TEL)

    Construction Period

    24 Months (March 2004 - March 2006)

    Project Description

    Tynagh Energy Limited has built Galway's first power generation facility. The circa €300 million power plant is a modern state-of-the art facility using the latest in advanced engineering technology. It uses the cleanest available fuel, natural gas, which significantly reduces emissions of carbon dioxide. For the first time, Galway city and the region has a reliable and efficient source of power.

    Main Contractor

    GAMA Power Systems - GE Energy Consortium

    Scope of Work

    • Commercial Operation Date (COD): Construction of the Tynagh Energy Limited power plant was completed and reached COD on the 29th of March, 2006 and was commissioned as agreed under the terms of the award with the CER.
    • Project financing: Joint financing has been arranged by Royal Bank of Scotland, KBC Bank, Ulster Bank and IIB Bank. Financial close was achieved on the 27th of August, 2004.
    • Project refinancing: The refinancing follows GAMA Construction’s sale of a 40% stake in TEL (Tynagh Energy Limited) to GE Energy Financial Services in May 2006. The same banks have refinanced existing non-recourse debt for Tynagh Energy Limited.
    • Electricity sales: Under the terms of the award from CER, 89% of output will be sold to ESB and 11% will be traded via BGE Trading Ireland Ltd.
    • Life-span of power plant: Approximately 30 years
    • Fuel type: Natural gas, distillate oil (back-up)
    • Fuel source: BGE is supplying the gas using bord gais ring main pipeline to transport it to the new power plant.

    The power plant was built under a turn-key contract with a consortium of General Electric Company / General Electric International Inc. and GAMA Power Systems Inc. The gas turbine used was a GE 9FA design. F-class gas turbines were developed in the late 1980s and are considered commercially proven with a track record of high availability and reliability. The steam turbine is a GE A15 ‘HEAT’ (high efficiency advanced technology) model, with a GE 9A5 electrical generator. The designs of both the A15 steam turbine and the 9A5 electrical generator were developments from previous GE models that are fully proven technology. These are logical evolutions from previous models and incorporate GE’s comprehensive design process and field-testing facilities which are without doubt world-class.

  • 2x8 MW CUMRA SUGAR FACTORY POWER PLANT 2x8 MW CUMRA SUGAR FACTORY POWER PLANT Konya / TURKEY Konya Sugar Factory Inc. / TURKEY

    Construction Period

    16 Months (July 2003 - December 2004)

    Project Description

    Turn-key design, supply and construction of a coal fired power plant, comprising 2 sets Babcock & Wilcox licensed 75 ton/hr (38 bar (a), 425oC) steam supply. Circulated Fluidized Bed (CFB) boiler, 2 sets Siemens steam turbine generators and one ea. 38 bar (a), 425oC steam supply, 60 ton/hr. capacity package type boiler, coal and limestone storage buildings including all auxiliary components.

    Main Contractor

    GAMA Power Systems Inc.

    Scope of Work

    GAMA was responsible for the followings;

    • General and detail design,
    • Execution of civil and structural works,
    • Supply and and erection of steam turbine, CFB and package boilers, water treatment plant, coal and limestone buildings and associated equipment,
    • Design, supply and installation of “Balance of Plant” equipment, mainly comprising dearators, boiler feed water system, HVAC system, fire extinguishing and alarm system, piping, medium and low voltage electrical systems, complete DCS systems including field equipment and UPS system,
    • Testing, start-up, commissioning and training of the client’s personnel.

  • 38 MW AYEN OSTIM NATURAL GAS FIRED COMBINED CYCLE POWER PLANT 38 MW AYEN OSTIM NATURAL GAS FIRED COMBINED CYCLE POWER PLANT Ankara / TURKEY AYEN Ostim Enerji Otoprodüksiyon San. ve Tic. A.Ş. / Turkey

    Construction Period

    21 Months (December 2002 - August 2004)

    Project Description

    Turn-key design, supply and construction of a natural gas fired combined cycle power plant, comprising GE (USA) LM2500 PY+DLE double shaft aeroderative gas turbine, Thermodyn (France) steam turbine and Aalborg Engineering (Denmark) HRSG (generating 30 tons/hr of high pressure and 7 tons/hr of low pressure steam), including all auxiliary components.

    Main Contractor

    GAMA Power Systems Inc.

    Scope of Work

    GAMA was responsible for the followings;

    • General and detail design,
    • Supply and and erection of gas turbine, HRSG, steam turbine, water treatment plant, air cooled condenser and associated equipment,
    • Design, supply and installation of “Balance of Plant” equipment, mainly comprising dearators, boiler feed water system, HVAC system, fire extinguishing and alarm system, piping, medium and low voltage electrical systems, complete DCS systems including field equipment and UPS system,
    • Testing, start-up, commissioning and training of the client’s personnel.

  • 150 MW KIRIKKALE DIESEL POWER PLANT 150 MW KIRIKKALE DIESEL POWER PLANT Kirikkale / Turkey Electricity Generation Co. Inc (Government)

    Construction Period

    12 Months (February 2001 - February 2002)

    Project Description

    Based on PPA, the project is a fully privately financed and constructed on turn-key basis with two significant phases:

    1. Construction of 150 MW (established capacity) combined cycle diesel power plant (consist of 13 each 11 MW engines and one 9.5 MW steam turbune & generator),
    2. Operation of the power plant for 5 years with 8,760 hr/year and 130 MW-100% availability. 

    EPC contract includes all basic & detailed design of the power plant, procurement of all power plant equipment, all civil, structural works, all mechanical erection works, installation of all electrical, instrumentation and control systems. The contract also includes commissioning, start-up works and training of client's personnel. Operation of the plant is also in the scope of GAMA.

    Main Contractor

    GAMA - Barmek JV

    Notes

    This project has been executed by a Joint Venture of GAMA and Barmek

  • 2x39.5 MW ERDEMIR COGENERATION POWER PLANT 2x39.5 MW ERDEMIR COGENERATION POWER PLANT Eregli / TURKEY Eregli Demir ve Celik Fabrikalari A.S. (Erdemir) / Turkey

    Construction Period

    First Unit: 14 Months (April 1996 - June 1997) • Second Unit: 16 Months (April 1996 - August 1997)

    Project Description

    Turn-key design, supply and construction of a natural gas fired cogeneration plant, comprising two GE frame 6B gas turbine generators (39.5 MW capacity each) and two HRSG’s (each generating 80 tons/hr of medium pressure and 4 tons/hr of low pressure steam), including all auxiliary components.

    Main Contractor

    Consortium of ELIN Energieversorgung (Austria), Babcock and Wilcox, GAMA (BWG) (Turkey)

    Scope of Work

    BWG was responsible for the followings;

    • Design, supply and construction of all civil and structural works,
    • Design, supply and manufacturing and erection of two horizontal natural circulation type heat recovery steam generators, complete with gas divertors, silencors and by-pass stacks. HRSG’s manufactured in GAMA factory, Ankara,
    • Design, supply and installation of “Balance of Plant” equipment, mainly comprising dearators, boiler feed water system, HVAC system, fire extinguishing and alarm system, piping, medium and low voltage electrical systems, complete DCS systems including field equipment and UPS system,
    • Erection of generators, steam turbine and associated equipment (supplied by ELIN),
    • Testing, start-up and commissioning.